/

Baggage Handling System Installation Nears Halfway Mark

Back to main Image Gallery

The Kansas City International Airport New Terminal baggage handling system is 44 percent complete. A single, modern baggage handling system by Vanderlande will replace separate systems at each airline like those in the existing terminals. The existing systems vary in age and manufacturer. In the New Terminal, there will be one arrivals level baggage claim lobby with multiple carousels. Ground transportation will be just outside the door. Click on the images to view larger.